Ivory and burgundy ribbed fabrics arranged for sample comparison.

FORMIVA · BUYER SUPPORT

Your Sourcing Questions

Answers about MOQ, sampling, sizing up to 8XL, OEM/ODM development, quality and shipping.

Start Here

The 15 questions to resolve before planning your order.

  1. Are you a manufacturer or a trading company?
  2. Do you specialize in plus-size women’s clothing?
  3. What sizes do you offer?
  4. Can I review your size charts before ordering?
  5. What is your minimum order quantity?
  6. Can I mix sizes, colours and styles in one order?
  7. Can I order samples before bulk production?
  8. Do you offer OEM, ODM and private labeling?
  9. What can be customized?
  10. How are sample costs calculated?
  11. How long do sampling and production take?
  12. How do you check sizing and workmanship?
  13. Can buyers arrange third-party inspections?
  14. What shipping and payment options are available?
  15. How are quality issues handled after delivery?

Supplier and company capabilities

Are you a manufacturer or a trading company?

We operate our own clothing factory in Xiamen, Fujian, China. Our business supports plus-size womenswear development and supply for brands and wholesalers. For a specific order, review the proposed production scope and responsibilities alongside the sample and quotation; a general company description does not replace product-level verification. The Factory page introduces our manufacturing work and available project information.

Link to this answer
Do you specialize in plus-size women’s clothing?

Yes. Our focus is mid-to-premium plus-size womenswear for brands and wholesalers serving the United States and Europe. Development considers the intended silhouette, body proportions and garment measurements rather than relying on a size label alone. Suitability still needs to be established for each style through its materials, specification and sample; specialization is not a promise that one fit works for every customer.

Link to this answer
Where is your factory located?

Our factory is in Xiamen, Fujian, China. Use this location when discussing the production origin and logistics plan, but do not assume it establishes the shipment’s departure port or delivery terms. Those details belong in the order arrangements. If you need a visit or remote review, explain the areas you want to assess before agreeing an appointment.

Link to this answer
Who do you supply?

We work with business buyers, including fashion brands and wholesalers targeting the US and European markets. Retailers and ecommerce sourcing teams can also discuss a business purchase or development brief. Prepare your product category, quantity, target customer and selling market so the proposed route fits your operation. This website is a B2B enquiry catalogue, not a consumer checkout or a guarantee of live stock.

Link to this answer
Which clothing categories can I explore?

The website organizes styles into Tops, Bottoms, Dresses & Skirts, and Co-ord Sets. These are browsing categories, not confirmation that every pictured variation is ready for immediate delivery. Review the individual product specifications and customization options. When a project falls outside these four groups, send a clear description for a feasibility review rather than assuming the same production route applies.

Link to this answer
Do you offer OEM, ODM and private labeling?

Yes. We support OEM, ODM and private-label enquiries, alongside ready-stock wholesale where availability is confirmed. OEM starts with your defined design and technical requirements; ODM develops an agreed direction from a concept or reference; private labeling applies approved branding to a suitable style. The sample route, customization scope and commercial conditions depend on the selected product and are agreed before bulk production.

Link to this answer
Can you develop for different US and European customers?

Yes. Our business serves US and European brands and wholesalers, but market names do not define a single size chart or fit preference. Provide your customer profile, target body measurements, intended use and destination requirements. Development should follow that brief. Any market-specific labeling, testing or import requirement must be identified separately; we do not treat serving a region as proof that every product automatically meets every local requirement.

Link to this answer
Does the website show live stock availability?

No. A product image or catalogue listing should not be treated as a live inventory confirmation. Availability is confirmed by style, colour and size. Check the chosen SKU, colour, size and current availability before planning a purchase. An image can communicate a design direction, but it does not establish that the garment is in stock or ready to ship.

Link to this answer
Who should handle my project enquiry?

Ada is the website’s named business contact. Send a consolidated brief with your selected styles, quantities and development questions through the existing enquiry route. Keeping the reference files and decisions together helps avoid conflicting instructions. An enquiry does not confirm an order or payment, so follow the displayed sending instructions and retain the agreed quotation and approvals separately.

Link to this answer
How should I request a factory visit?

Propose your preferred dates, attendees and the processes you want to review before arranging travel. A visit needs an agreed appointment and scope; access to every work area or project should not be assumed. For a useful assessment, connect the visit to your own garment brief and sample questions. Photos or a tour alone cannot establish the performance of a future order.

Link to this answer
How can I check whether you can accommodate my order?

Submit the style complexity, total quantity, proposed colour–size breakdown and required arrival window for a project-specific schedule review. Do not calculate available capacity from a workshop photograph or an old general reference. Material readiness, sample approval and the production plan affect what can be committed. Obtain a written schedule for your order before making downstream delivery promises.

Link to this answer
What evidence should I request for a certification claim?

Request the exact document, its scope, issuing body, validity and connection to the product or facility concerned. A logo or a general statement is not enough to verify a claim. This FAQ does not assert a particular factory or material certification. If your programme requires one, identify it in the brief so applicability and supporting evidence can be reviewed before you commit.

Link to this answer
Explore related information →

Wholesale ordering, MOQ and assortment planning

What is your minimum order quantity?

Catalogue orders start at 100+ pcs. Custom OEM/ODM projects start at 150+ pcs. The applicable style, colour and size allocation must be agreed for the actual order; the figure does not mean that every individual combination can be ordered freely. Final colour and size breakdown is confirmed with quotation. Send a proposed order matrix and have the quantity basis recorded in the quotation before confirming your purchase.

Link to this answer
Can I mix sizes, colours and styles in one order?

Mixed sizes and colours are supported by agreement. Combining different styles requires a separate review of the proposed assortment and applicable minimums; do not assume that 100+ pcs can be divided arbitrarily across all styles. List quantities for each style, colour and size. That matrix lets both parties distinguish an agreed mixed order from an informal total that leaves the actual production allocation unclear.

Link to this answer
How should I plan a first wholesale order?

Start with a focused assortment whose styles serve distinct customer needs, then allocate sizes and colours using the best evidence you have. If sales history is limited, label the allocation as provisional rather than presenting it as a proven demand ratio. Confirm the supplier’s minimum conditions and replenishment options. A small order with too many combinations may still be difficult to evaluate or reorder efficiently.

Link to this answer
Is there a standard size ratio I should order?

No single size ratio is appropriate for every brand, style or market. Use your own customer and sales information where available, including periods when a size was unavailable. For a new collection, compare a few allocation scenarios and decide what you need to learn. Keep the planned ratio separate from the garment’s actual measurements: inventory distribution and fit specification are different decisions.

Link to this answer
How many colours should a new style launch with?

Choose a manageable colour range based on the style’s role, your channel and the minimum conditions for the material or process. There is no verified universal number that guarantees a successful launch. Each extra colour can divide the quantity available across sizes and create additional approval work. Prioritize clear differences between colours and confirm how repeat availability would be handled before broadening the assortment.

Link to this answer
Does PCS mean garments or complete sets?

The quotation must identify the counting unit for the selected product. Do not assume that a two-piece outfit is counted the same way as two individual garments. Record whether quantities, prices and packing refer to pieces or complete sets, and make the style matrix use that same unit. Clarifying this early prevents a correct-looking total from representing a different order than the buyer intended.

Link to this answer
What information makes a quotation useful?

Provide the style reference, material requirements, size range, colour allocation, quantity, branding, packing and destination. Include the intended delivery window and any mandatory checks. These inputs make quotations more comparable and reduce assumptions. If an element is undecided, describe the alternatives you want priced rather than asking for a single figure that silently combines different specifications or excludes necessary work.

Link to this answer
Should I choose ready stock or custom production?

Ready stock can suit a buyer who accepts an available style and its confirmed specifications; custom production suits a brief requiring development or changes. Availability, branding feasibility and delivery still need checking in either route. Custom work introduces sample and approval decisions, while ready stock may offer less design flexibility. Compare the actual products and terms rather than assuming one route is always cheaper or faster.

Link to this answer
Are different colours counted as separate styles?

For assortment planning, colour variants normally belong to the same underlying style when its design and construction are unchanged. They still need distinct order references and may require their own material or colour approvals. Do not inflate a style count by repeating one garment in several colours. A construction change should be documented clearly so the buyer knows whether it creates a new product specification.

Link to this answer
What should I confirm before paying for ready stock?

Confirm the exact SKU, colour, size quantities, current availability, condition, labeling and dispatch arrangements in writing. A catalogue image is not a reservation. Check whether the offered stock matches the specification you reviewed and whether any branding or repacking work is included. Resolve substitutions before payment rather than allowing a different colour or size to be supplied simply because the overall piece count matches.

Link to this answer
Can I reorder a style after the first delivery?

A repeat order can be discussed, but material availability, current minimums and scheduling must be checked again. Retain the approved sample, specification and material reference from the first order. Ask whether anything has changed before assuming the repeat is identical. A product remaining visible on the website does not guarantee indefinite availability of the same fabric, trim or colour.

Link to this answer
Can I change quantities after confirming an order?

Request a written change review before assuming revised quantities can be accepted. The effect depends on what has already been ordered, cut or produced and on the agreed order terms. Record any effect on price, allocation and schedule, then update the purchase documents. An informal message with a new total should not replace the approved style–colour–size breakdown.

Link to this answer
How can I reduce cost without weakening the specification?

Compare the cost drivers before removing essential requirements. Consolidating compatible materials or simplifying a nonessential detail may help, but every proposed change needs a technical and commercial review. Do not assume fewer inspections or an unapproved material substitution is an acceptable saving. Ask for clearly described alternatives so you can see what changes in the garment, price and approval process.

Link to this answer
How far ahead should I plan a seasonal collection?

Work backward from when goods must be available in your operation, allowing for development, approvals, production, transport and receiving. There is no single safe calendar for every order. Confirm project-specific milestones and the assumptions behind them. If a fit or material decision remains open, show that dependency explicitly rather than treating an unapproved sample as ready for production.

Link to this answer
What should the final purchase order identify?

The purchase order should connect the approved product specification to the quantity matrix, price basis, payment terms, delivery terms and acceptance arrangements. Identify the governing sample and revision, not just the style name. Include agreed labels and packing requirements. If the quotation and purchase order differ, resolve the discrepancy before production so neither party has to infer which instruction controls.

Link to this answer
Explore related information →

Sizing, grading, fit and measurements

What sizes do you offer?

S–8XL describes our overall development range, not a promise that every style is available in every size. The actual size run and dimensions must be confirmed for the chosen product. These labels must not be automatically converted into fixed US, UK or EU numbers. Use a style-specific chart and an approved sample to decide whether a garment meets your customer’s requirements.

Link to this answer
Can I review your size charts before ordering?

Yes. Request the available chart for each shortlisted style before approving an order, and identify whether it describes bodies or finished garments. A development concept may need an agreed specification rather than an existing production chart. Review measurement locations, units and the proposed size run with the sample; do not treat an overall S–8XL capability statement as the chart for an individual product.

Link to this answer
What is the difference between body and garment measurements?

Body measurements describe the wearer; finished-garment measurements describe the clothing at defined points. The difference can include intended ease, but only when corresponding locations and measurement methods are compared. A flat width is not the same as a full circumference. Label both charts clearly and keep them separate so a body target is not accidentally used as a cutting or finished-garment specification.

Link to this answer
Why can the same size label fit differently across styles?

A size label identifies a position within a particular sizing system; it does not fully describe a garment’s dimensions or silhouette. Material, ease, construction and proportion can differ between styles. Compare the relevant measurements and intended fit instead of ordering solely by the label. Consistent brand labeling is useful, but it still needs style-level information that explains what the customer will receive.

Link to this answer
Can I use one conversion between US, UK and EU sizes?

Do not rely on a universal conversion for production approval. Regional labels and brand systems can describe different measurement expectations, and a converted number does not establish garment fit. Define your target customer chart and the labels you intend to sell under, then approve the corresponding garment specification. Verify that product descriptions and labels use the agreed system consistently rather than mixing regional numbers.

Link to this answer
Can development follow my brand’s size chart?

Yes, your target measurements and fit requirements can form part of the development brief. Clarify whether your chart contains body measurements or finished-garment dimensions and provide the intended silhouette. The team must review the relationship with the selected material and construction. Approval should be based on the resulting sample and specification, not on copying size names onto an otherwise unchanged pattern.

Link to this answer
How is pattern grading different from simply making a garment bigger?

Pattern grading applies controlled changes at defined points across a size run. Simply enlarging every part by the same proportion can alter relationships that need separate consideration, such as shoulder, sleeve, rise or length. Ask which rules and checkpoints apply to your design. A larger image or scaled drawing does not demonstrate that the finished garment will balance or move as intended.

Link to this answer
What is garment ease?

Ease is the relationship between the garment’s dimensions and the corresponding body dimensions for an intended fit. It can support a silhouette and movement, but it is not a fixed allowance suitable for every style. Material extension, layering and construction affect the decision. Specify the wearing brief and review the physical sample rather than applying one extra-centimetre rule to an entire collection.

Link to this answer
How should we develop for different body proportions?

Define the customer proportions and use relevant fit checkpoints rather than assuming one participant represents everyone in a size. Similar bust, waist and hip values can still accompany different distributions and lengths. Record garment balance and movement respectfully. The aim is a clear fit brief with known boundaries, not a claim that one block can fit every body equally well.

Link to this answer
What if our target measurements fall between two proposed sizes?

Review the full measurement relationship and intended silhouette before choosing a label or altering the chart. Selecting the larger size does not automatically resolve every proportional issue. For development, decide whether the block, size interval or ease needs attention and test the proposed solution. Keep the decision tied to the target customer and actual material rather than a universal rule about sizing up.

Link to this answer
Which measurement points should a specification include?

Include the points needed to control the chosen garment, with diagrams showing exactly where each measurement begins and ends. Tops, trousers and dresses need different controls; one generic chart is rarely enough. State units, garment condition and whether closures are fastened. The essential test is whether two people can follow the instructions and obtain a comparable measurement without guessing the location.

Link to this answer
Can a flat garment width be doubled into a circumference?

Only when the measurement method and garment construction make that comparison appropriate. A flat width, curved seam, gathered area or asymmetric construction may need a more specific instruction. Do not double every value automatically. Ask for the point-of-measure definition and use the same method during sampling and inspection so apparently matching numbers actually describe the same dimension.

Link to this answer
What measurement tolerance should we use?

Agree tolerances for the specific garment, material and measurement points before production. A single tolerance for every point or product is not automatically appropriate. Distinguish an intended specification value from the permitted variation around it, and define how measurements are taken. Do not select a tolerance after seeing an inspection result simply to make an out-of-specification garment appear acceptable.

Link to this answer
How do we separate fit preference from a measurable requirement?

Describe the desired silhouette as a preference, then identify observable requirements such as coverage, closure behaviour and movement. “Relaxed” or “close fitting” alone is not a complete specification. Record what is intentional and what requires correction. This helps prevent a reviewer’s personal styling preference from becoming an unexplained pattern change or a production defect after the sample has already been approved.

Link to this answer
Which sizes should we check during fit development?

Choose checkpoints according to the size range, pattern changes, material and design risk. An approved base sample does not automatically validate the whole run, and checking every size is not always the only practical approach. Ask the technical team to explain the proposed checkpoints, including any grading transitions. Add verification where a change or uncertain result makes the original plan insufficient.

Link to this answer
What movements should a fit review include?

Use actions relevant to how the garment will be worn, such as sitting, walking or comfortable reaching. Review coverage, pressure and whether the garment returns to position, using consistent underlayers and conditions. These observations support development but do not create a universal comfort guarantee. Record the action and location of an issue so the pattern team can investigate it rather than guessing from a general comment.

Link to this answer
Why does trouser rise matter beyond waist and hip measurements?

Rise and front–back balance influence where trousers sit and how they behave during sitting and movement. Matching waist and hip values alone does not establish an appropriate fit. Review the defined measurement points and physical sample with the intended wearing position. Avoid prescribing one standard rise increase from a photograph; the cause of pulling or bunching needs a garment-specific assessment.

Link to this answer
How should we assess upper-arm and sleeve fit?

Review sleeve room, armhole relationship and movement together rather than checking upper-arm circumference in isolation. A sleeve may look acceptable with arms relaxed yet restrict the intended action. Document where pressure or shifting occurs and let the technical review identify the cause. Increasing the whole sleeve without checking nearby proportions can create a different issue instead of resolving the original one.

Link to this answer
Can we request different sleeve, trouser or dress lengths?

Length changes can be included in a customization brief, subject to review of the style and construction. Specify the measurement points and intended customer proportion rather than asking only for “tall” or “short.” A length change may affect openings, pockets, shaping or overall balance. Approve the revised specification and sample before treating the change as a simple extension of the original garment.

Link to this answer
Can product photographs prove how a garment fits?

No. Photographs communicate appearance but cannot establish pressure, recovery, movement or verified measurements. Confirm fit using the style-specific size chart and garment sample. Use the actual product specification and physical sample for approval. Request missing views where needed, but do not interpret an invented or unseen back detail as evidence of the garment’s construction.

Link to this answer
Explore related information →

Fabrics, stretch, comfort and garment care

How can I confirm a product’s fabric composition?

Use the composition associated with the actual material and product reference, supported by appropriate documentation where required. Do not infer fibre content from a photograph, texture description or concept image. Check that any final label matches the approved material. If a composition is not available in the product record, resolve it during material selection before approving labeling or bulk production.

Link to this answer
What is the difference between stretch and stretch recovery?

Stretch describes extension under specified conditions; recovery describes how the material returns after the extension is removed. A fabric can extend easily yet retain unwanted growth. Fibre percentage and a hand-pull demonstration do not establish both properties. For a performance requirement, agree a suitable assessment with a qualified testing provider and connect the result to the actual material being purchased.

Link to this answer
Does a higher elastane percentage always mean better fit?

No. Composition alone does not establish fit or material performance. Construction, finishing, garment shape and seams also affect how the product behaves. Choose material against the intended silhouette and movement requirements, then verify the sample. Avoid ranking fabrics by elastane percentage without comparing their relevant behaviour, and do not use a fibre percentage as a substitute for a finished-garment fit review.

Link to this answer
How should we assess breathability for summer styles?

Start with the intended use and evaluate the material and garment assembly separately from appearance. Light weight or a natural-fibre label does not by itself prove breathable performance. Linings and other layers can change the wearing conditions. If breathability is a selling requirement, identify the property and obtain an appropriate assessment instead of treating an attractive summer photograph as supporting evidence.

Link to this answer
How can we review whether a fabric provides enough coverage?

Review the actual material in the intended garment under consistent lighting and relevant movement, including any extension or underlayer that matters to the brief. A flat swatch can look different when worn. Define acceptable coverage rather than assuming a dark colour or lining guarantees opacity. Record the reviewed conditions and avoid extending a visual observation into an unrestricted performance claim.

Link to this answer
Does a higher GSM mean a better-quality fabric?

No. GSM describes mass per area, not overall quality, drape or suitability. A heavier fabric may be appropriate for one design and undesirable for another. Compare composition, construction, finish and sample behaviour alongside weight. Request the actual material reference and specification so a broad adjective such as “premium” does not replace the properties needed to make a purchasing decision.

Link to this answer
When should we choose knit rather than woven fabric?

Choose according to the intended silhouette, movement, surface character and construction, not a blanket rule that one category suits plus-size clothing better. Knits and wovens each include materials with very different behaviour. Compare suitable samples and the complete garment cost. A change between the two may require pattern and assembly changes rather than a direct fabric substitution.

Link to this answer
Should we approve a physical fabric swatch?

A physical reference is useful for reviewing colour, texture and handle, but it does not replace a garment sample or technical evidence where performance matters. Identify the supplier article and any approved finish so the swatch is traceable. Keep the approval linked to the order. An unmarked swatch or screen image may be difficult to reconcile with the material delivered for production.

Link to this answer
Why can fabric colour differ from the screen image?

Screens, lighting and photography can change how a colour appears. Use an agreed physical reference and approval conditions for colour-critical orders rather than treating a website image as the final standard. Record the selected colour reference and material together. If a production submission differs, review it before release; a shared colour name does not guarantee that two materials will look identical.

Link to this answer
Should fit be reviewed after washing?

Yes, where the intended care process could affect the garment, review relevant dimensions and appearance after that process as well as before it. Use a defined procedure and consistent points of measure. Do not assume every fabric has the same dimensional change or that one wash observation predicts all future behaviour. Keep material and construction references attached to the approval record.

Link to this answer
How should care instructions be selected?

Care instructions should reflect the actual material, trims, construction and relevant evidence for the finished garment. Do not copy instructions from a visually similar product without checking suitability. The buyer’s destination requirements also need review. Agree the final label content before production, keeping decorative branding separate from factual composition and care information that must accurately describe the supplied garment.

Link to this answer
Can you guarantee that a fabric will never pill?

Pilling resistance must be evaluated on the selected material. If pilling resistance matters to the product, define the intended use and request an appropriate assessment of the actual material. Compare the evidence with your acceptance requirements. A satisfactory result under one procedure should not be rewritten as a promise that the garment will never change under any use.

Link to this answer
How can we assess colour transfer risk?

Identify likely contact and care conditions, then request the relevant assessment for the actual colour and material. Rubbing, laundering and light exposure concern different behaviours; one generic approval does not answer every question. Keep reports tied to their submitted references. A shade approval confirms appearance, not necessarily colourfastness, so the two decisions should be recorded separately.

Link to this answer
Is a lining always necessary for plus-size garments?

No. The need depends on coverage, construction, drape and the intended wearing experience. A lining may address one requirement while adding weight, cost or another fit relationship to manage. Review shell and lining together where used. An unlined garment can be appropriate with suitable materials and finishing; the choice should follow the style brief rather than a general assumption about body size.

Link to this answer
Can an approved fabric be replaced with a similar one?

A substitute needs review before it is treated as equivalent. Similar colour and appearance do not establish the same composition, movement, care or fit behaviour. Identify the proposed change and decide what sample or testing evidence is necessary. Update the specification and approval record if accepted, so production and inspection do not continue using references for a different material.

Link to this answer
Explore related information →

OEM, ODM, private labeling and packaging

What can be customized?

We support discussions about fabric, colour, fit, sizes, logos, labels and packaging. The feasible combination depends on the chosen style, material and production brief. Supply specifications or references for the changes you want, then agree the sample, cost and quantity conditions. Customization support does not mean every proposed process or material is automatically available without development or separate approval.

Link to this answer
What should I provide for an OEM project?

Provide your design and technical requirements, including measurements, material references, construction details, branding and quantities. Identify the revision that controls the request. A clear tech pack reduces assumptions but still needs a feasibility review and sample approval. Where an element is unresolved, list it as a decision to make rather than allowing the production team to infer a detail from an incomplete image.

Link to this answer
What should I provide for an ODM project?

Bring a collection concept, sketch or authorized reference together with your target customer, category, size requirements and budget direction. ODM involves agreeing development choices, not copying an unidentified product exactly. Explain what you want to retain and what is open to proposal. Materials, shape and details should become an approved specification through sampling before the design is released for production.

Link to this answer
How is private labeling different from changing the garment design?

Private labeling concerns the agreed branding of a suitable style; a change to the pattern, material or construction introduces additional development work. The two can be combined, but they should not be quoted as though they were identical tasks. Specify the branding and any garment changes separately so the sample requirements, costs and minimum conditions can be reviewed accurately.

Link to this answer
Can I start without a complete tech pack?

Yes, a concept or reference can start a development discussion, but production still needs agreed technical information. Describe the intended customer, silhouette, materials and quantity as clearly as possible. Identify the details you need help resolving. A reference image alone cannot establish hidden construction, exact composition or measurements, so those points must be decided rather than guessed during sampling.

Link to this answer
Can I send another garment as a design reference?

Use references you are entitled to share and explain the design qualities you want to discuss. A reference can communicate direction, but it should not be treated as permission to copy protected branding or artwork. Separate visible features from details that are unknown. Agree an authorized design and specification before production instead of requesting an exact replica on the strength of a photograph.

Link to this answer
What logo files should I prepare?

Provide clear artwork with the intended dimensions, colours, placement and application method where known. Ask which production file format is needed for the chosen process rather than assuming a small screen image is adequate. Review a representative submission before release. The artwork approval should identify the correct revision so labels or decoration are not produced from an outdated file.

Link to this answer
What should be included in a label brief?

Separate decorative brand labels from factual product information such as composition, care and size identification. Specify dimensions, material, colour, placement and attachment for each component. Destination requirements need appropriate review before artwork is finalized. Do not add unverified certification marks or claims to make a label look complete; the final content must correspond to the actual garment and approved information.

Link to this answer
What information is needed for custom packaging?

Describe the required components, dimensions, materials, quantity, artwork and packing sequence. Explain whether the packaging serves wholesale receiving, a retail channel or another agreed use. “Premium packaging” alone is not a reproducible specification. Confirm feasibility and cost separately from the garment, and approve the relevant reference before bulk packing so the team does not have to interpret a styling image as an instruction.

Link to this answer
Can a barcode or SKU label be included in the packing brief?

Include the required code data, format, placement and scanning requirements in your packing request for review. The buyer should verify that the identifiers are correct for its own inventory system. Do not assume that garment production automatically includes creating or validating retail codes. Where accepted, approve a label reference and check that it maps to the correct style, colour and size.

Link to this answer
How do we specify a custom colour?

Provide a controlled colour reference and identify the material and components to which it applies. A colour name or digital thumbnail is not a reliable approval standard. Ask what submissions and quantity conditions are required for the proposed route. Review the actual material under agreed conditions, then retain the approved reference rather than relying on memory when the order reaches production.

Link to this answer
How should we choose between printing and embroidery?

Compare the finished effect on the intended material, including detail, scale, hand, reverse-side finish and care requirements. Neither method is best for every design. Request feasibility and a relevant sample for the proposed artwork. Include setup and application costs when comparing quotations, and approve any design simplification explicitly rather than letting the process silently change the original artwork.

Link to this answer
Can pockets, buttons or closures be changed?

Such changes can be proposed for development, but they need review in relation to the garment’s construction and use. Specify the location, dimensions and intended function rather than only the appearance. A closure or pocket change can affect fit, reinforcement and assembly. Confirm the revised sample and specification before treating a visually small alteration as a production-ready instruction.

Link to this answer
How should design files and pattern ownership be agreed?

Record ownership, permitted use, confidentiality and any file-delivery obligations in the project terms before development starts. Do not assume that paying a sample fee automatically transfers every pattern or production file. This is a matter to agree for the specific project, not a blanket policy asserted by this page. Identify the assets concerned and obtain appropriate contractual advice where necessary.

Link to this answer
Can I assume an ODM design is exclusive to my brand?

No. Selecting or customizing a style does not grant exclusivity. If it matters to your programme, discuss the exact design, territory, duration and permitted variations, then document the agreed terms before commitment. Branding a garment does not by itself establish exclusive rights to its underlying design. This FAQ makes no general exclusivity promise for the styles shown online.

Link to this answer
Explore related information →

Sampling, development and production timing

Can I order samples before bulk production?

Yes. Sampling is part of our development service and can be discussed before a bulk commitment. Identify whether you need to review fit, material, construction, branding or the final production reference, because those purposes may require different submissions. Agree the sample specification, cost and shipping arrangements first. Receiving a sample does not mean unresolved colours, sizes or packing details have also been approved.

Link to this answer
How are sample costs calculated?

Sample costs depend on the agreed brief, including materials, development work, construction and any branding or special components. Request an itemized quotation for the submission you need and clarify shipping separately. There is no universal free-sample or refundable-fee promise on this page. If a fee credit is proposed, its conditions must be written into the quotation rather than assumed.

Link to this answer
How long do sampling and production take?

Timing is confirmed for the specific style, material availability, approval stages and order scope. Ask for separate sampling, production and transport milestones rather than one unqualified delivery number. Confirm when each period starts and whether it uses working or calendar days. A revised sample, late artwork or material substitution can change the plan, so retain an updated written schedule for your project.

Link to this answer
What is the difference between a fit sample and a pre-production sample?

A fit sample supports decisions about shape and the wearing relationship; a pre-production reference confirms the agreed production specification, including relevant materials, construction and branding. An early sample may not include every final component. Record exactly what each approval covers, and do not let an accepted fit become accidental permission to produce with unresolved fabric, labels or packing.

Link to this answer
How should I request a sample revision?

Send one consolidated comment record that identifies the sample version, observation, location and desired outcome. Separate required corrections from styling preferences and unanswered questions. Avoid conflicting instructions in several messages. After the revision, compare it with the same reference conditions and confirm which changes are approved; a new sample should not erase the history of why the change was requested.

Link to this answer
Is a fixed number of sample rounds enough for every style?

No. The appropriate development route depends on design complexity, material familiarity and the evidence from each review. Agree the included work and how additional revisions are handled before starting. Do not promise an approval after a predetermined number of rounds regardless of results. A repeat style and a new block may need different verification, even when their photographs appear similar.

Link to this answer
Can an early sample use substitute fabric?

A substitute can sometimes support a limited development discussion, but its purpose and limitations must be explicit. It may help communicate construction while failing to represent final drape, stretch or fit. Do not use that submission to approve properties it cannot demonstrate. Identify what must be checked again with the intended material before the garment becomes the production reference.

Link to this answer
Who should approve a sample on the buyer’s side?

Designate one decision owner who can consolidate technical, merchandising and branding feedback into a clear approval. Other reviewers can contribute, but production should not receive contradictory final instructions. Record the approved version and any remaining conditions. An informal positive comment about appearance is not a substitute for identifying which parts of the specification are authorized for the next stage.

Link to this answer
What needs to be settled before bulk production begins?

The production reference should identify the approved sample, material, measurements, construction, artwork, quantity allocation and packing requirements. Commercial and inspection arrangements also need agreement. Resolve conflicts between documents before release rather than expecting the factory to choose an interpretation. A sample approval with open conditions should state who will verify their completion and what evidence permits production to proceed.

Link to this answer
What should we do if an approval threatens the delivery date?

Review the remaining dependencies and obtain a revised plan before making a commitment. Options may involve changing the launch date or selecting a different agreed route, but they must not silently remove necessary fit or quality checks. Ask which activities can genuinely overlap and which require approval first. Faster shipping cannot automatically compensate for an unresolved development issue.

Link to this answer
Does a repeat order always need a new sample?

Not always, but the decision should follow a review of changes since the original approval. Material, trims, pattern version and production conditions matter even when the SKU is unchanged. Identify which evidence still applies and what needs renewed verification. Keep an appropriate retained reference so a repeat is controlled by the approved specification rather than by a photograph or someone’s memory.

Link to this answer
What should accompany a dispatched sample?

The sample should be identifiable by style, size, colour or material reference, revision and the purpose of the submission. Include the questions the buyer is expected to decide and any known substitutions or limitations. Confirm shipping arrangements separately. Without this context, a sample can be visually reviewed yet approved against the wrong specification or mistaken for the final production version.

Link to this answer
Explore related information →

Quality control, inspections and documentation

How do you check sizing and workmanship?

Our confirmed quality-control scope includes dimensions, appearance, sewing, logos and packaging. The order should define the approved reference, measurement methods and acceptance requirements for those checks. Do not infer a particular laboratory certification or inspection percentage from this general scope. Discuss the style’s critical points before production so the review addresses the actual garment rather than only a generic checklist.

Link to this answer
Can buyers arrange third-party inspections?

Yes. Third-party inspection is supported by arrangement. Agree its scope, timing, access, reporting and responsibilities before booking, including how findings will be handled. Inspection costs and release decisions belong in the order terms. A booked inspection does not itself confirm that the goods are ready or that every possible material, legal and performance requirement will be covered by the visit.

Link to this answer
Which reference should an inspector use?

Use the approved product specification and identified production sample, together with the purchase order’s allocation and packing requirements. Make sure revisions agree before the inspection. If the sample and written sheet conflict, resolve the difference rather than asking the inspector to guess. Provide the relevant documents in advance so important requirements are not confined to private messages the inspector cannot see.

Link to this answer
How does product inspection differ from laboratory testing?

Inspection evaluates the agreed observable features of goods, while laboratory testing evaluates specified properties under defined methods. An inspection report may cover measurements and workmanship without proving composition or other material performance. Decide which requirements need separate testing and identify the actual submitted material. Neither document should be presented as evidence of properties that fall outside its scope.

Link to this answer
What should we look for when reviewing seams?

Check the seam against its specified construction, location and intended use, including appearance, internal finish and behaviour during relevant movement. A straight-looking line is not sufficient proof of performance. Document the observed issue before prescribing a correction, because thread breakage, material movement and assembly distortion can require different investigations. Relevant technical assessment should support any performance requirement in the order.

Link to this answer
Does an AQL inspection guarantee every piece is defect-free?

No. A sampling inspection is not a statement that every unit has been examined or that the lot contains no defects. Agree the applicable plan, defect classifications and decision process with the inspection provider. This page does not prescribe one universal AQL level. Separate the sampling decision from any additional buyer requirements and record how unacceptable findings will be addressed.

Link to this answer
How should defects be classified before inspection?

Describe the relevant defects and their significance for the product before inspection begins. Use the agreed specification and competent inspection guidance rather than deciding categories after results arrive. Give examples where ambiguity is likely, such as a decorative detail versus a functional closure issue. A shared definition helps the buyer, supplier and inspector discuss the same finding without changing the rules retrospectively.

Link to this answer
What should a garment measurement record contain?

Identify the style, sample or lot, size, measurement points, target values, agreed tolerances and observed values. State the method and garment condition so the comparison can be repeated. Keep body measurements out of a finished-garment inspection sheet unless clearly identified as separate context. A record with numbers but no points of measure may look precise while remaining difficult to interpret.

Link to this answer
How do we know when goods are ready for final inspection?

Confirm readiness with the supplier and inspection provider against the agreed inspection stage. The required production and packing status should be explicit before the visit. If only part of the order is available, the report may not cover the whole intended scope. Do not treat a calendar booking or a photograph of cartons as proof that all ordered combinations are ready to assess.

Link to this answer
What happens if inspection identifies a problem?

Review the finding, affected scope and proposed corrective action before releasing the goods. Decide what evidence is needed to close the issue, which may include further inspection depending on the correction and agreement. A photograph of one repaired garment does not establish the status of the entire order. Keep the original report, response and closure decision together rather than replacing the record with a vague approval.

Link to this answer
Which quality documents should we agree before ordering?

Identify the documents relevant to your product and destination, such as the approved specification, measurement record, inspection report and any required material evidence. Availability and scope need confirmation for the order; this page does not promise a standard certificate package. Ask what each document demonstrates and which product it covers. Avoid requesting generic certificates while leaving the actual garment’s key requirements undocumented.

Link to this answer
How can we review consistency across a production batch?

Define the relevant comparisons—such as measurements, colour, construction and labeling—and include them in the inspection brief. Use the approved references and an agreed sampling approach rather than relying on a single attractive unit. Record identified differences and their scope. Consistency cannot be established from a website image, and a sample approval should not be described as a completed inspection of the later bulk order.

Link to this answer
Explore related information →

Payments, shipping, customs and after-sales

What shipping and payment options are available?

Express, air and sea freight are supported. The available payment methods, payment schedule, shipping terms and costs are confirmed in the quotation for your order. This FAQ does not promise a particular payment platform or deposit percentage. Compare the full arrangement, including what is included and when responsibilities transfer, before treating a quoted garment price as the total delivered cost.

Link to this answer
What should we verify before sending payment?

Check the accepted quotation, order reference, payment schedule and recipient details through an established communication channel. Investigate an unexpected change in payment instructions before acting. This is general transaction-control guidance, not a guarantee of any payment method’s protection. Do not assume that a familiar logo, email address or screenshot independently verifies a request; keep your own approval and recordkeeping procedures in place.

Link to this answer
How should we choose between express, air and sea freight?

Compare the actual shipment size, urgency, destination, handling requirements and quoted service. Each option can involve different cost and timing trade-offs, so avoid choosing from a generic speed ranking alone. Ask what is included, what remains outside the quote and how delivery uncertainty is handled. Confirm the production-ready date separately because a transport estimate does not establish when the goods will leave the factory.

Link to this answer
Is shipping included in the garment quotation?

Only if the quotation expressly includes it under the agreed delivery terms. Garment price, sample shipping and bulk freight should not be assumed to share the same basis. Request a clear breakdown and identify any destination charges that remain outside the offer. Comparing an ex-factory figure with a delivered figure without adjusting the scope can make one quotation appear cheaper than it really is.

Link to this answer
Who is responsible for import clearance and duties?

Responsibility depends on the agreed delivery terms and destination arrangements, so establish it before shipment. Obtain destination-specific advice from your broker or appropriate adviser rather than relying on a general FAQ for a tax or customs conclusion. Confirm who provides documents and who handles clearance. This page does not promise duty-free delivery or a universal tax amount for US or European orders.

Link to this answer
What shipping documents should the buyer prepare for receiving?

Ask the logistics provider and destination broker which documents and data are required for the specific shipment. Reconcile product descriptions, quantities and packing information with the approved order. Do not assume that one universal document list covers every destination or route. Resolve discrepancies before dispatch where possible, and keep the agreed commercial and shipping references accessible to the team receiving the goods.

Link to this answer
Can an order be shipped in separate consignments?

Request a project-specific review before planning split shipments. The allocation, readiness, transport cost and receiving arrangements may change, and no blanket split-shipment policy is asserted here. If agreed, document which styles, colours and sizes belong in each consignment. Preserve a clear outstanding balance so an early shipment is not mistaken for completion of the entire purchase order.

Link to this answer
How should we plan for transport delays?

Separate the production schedule from the transport estimate and allow a risk-appropriate receiving buffer. Ask the logistics provider how progress and exceptions are communicated for the chosen service. A quoted estimate should not be presented to your customers as an unconditional arrival guarantee. If timing changes, update the downstream plan using the actual shipment status rather than assuming faster production can resolve every transit issue.

Link to this answer
What should we check when the shipment arrives?

Reconcile the received cartons and quantities against the order and packing information, and record visible discrepancies promptly. Follow the agreed receiving and claim procedure, preserving relevant packaging and product references where an issue arises. Do not assume a piece-count match confirms the correct colour–size allocation. Keep receiving observations separate from assumptions about the cause so the responsible parties can investigate the evidence.

Link to this answer
How are quality issues handled after delivery?

Verified quality issues can be addressed through replacement or resupply under the conditions agreed for the order. Report the product reference, affected quantity and clear evidence so the issue can be assessed. This is not an automatic refund or unlimited return promise. Agree the claim process and responsibilities before ordering, and keep the approved specification and inspection records available to support a fair review.

Link to this answer
What cancellation or return terms apply to a B2B order?

Use the terms expressly agreed for that order; do not assume consumer return rules or an unrestricted cancellation right apply to customized production. Clarify the process before commitment, including any consequences once materials or work have been commissioned. This page does not establish a general refund deadline or cancellation charge. Where legal interpretation is required, obtain advice relevant to the contract and destination.

Link to this answer
Prepare an order enquiry →

Sourcing plus-size womenswear from China

How can buyers find suitable Chinese plus-size clothing suppliers?

Build a shortlist against your actual category, fit, quantity and development requirements, then compare evidence rather than rankings or promotional claims. Review relevant samples, communication, technical questions and the proposed order process. A supplier suitable for one programme may not suit another. Use a consistent brief for evaluation; this page does not provide competitor lists or claim that our company is the only suitable choice.

Link to this answer
How can buyers distinguish manufacturers from trading companies?

Ask which entity contracts the order, which facility performs the work and who controls development, production and quality decisions. Compare the explanation with appropriate business and process evidence. Manufacturing and trading roles can each serve different sourcing needs; the label alone does not prove quality. Resolve responsibility for your actual garment instead of treating a workshop photograph as conclusive proof of the commercial relationship.

Link to this answer
How can buyers verify plus-size pattern-making capability?

Request a relevant development discussion, defined measurement approach and physical samples at appropriate size checkpoints. Ask how proportions and grading transitions are reviewed, rather than accepting a large size label as proof. Evaluate the sample against your customer brief and material. Do not infer pattern capability from AI imagery or a single straight-size sample enlarged visually; the evidence should relate to the intended size run.

Link to this answer
What should buyers request before ordering samples from a supplier?

Agree the sample’s purpose, specification, material reference, fee, timing and shipping basis before work starts. Identify known substitutes and what the sample will not verify. Request a clear approval route so both parties understand the next decision. A low sample price is not directly comparable with another offer if the included development work, components or revision arrangements differ.

Link to this answer
How should buyers compare quotations from Chinese suppliers?

Compare quotations using the same product specification, quantity matrix, unit, branding, packing, inspection and delivery basis. Identify exclusions and assumptions before ranking totals. A cheaper figure may describe a different garment or omit necessary work. Evaluate communication and evidence alongside price, without assuming either the lowest or highest quote guarantees quality or that a supplier’s general claims apply to your specific order.

Link to this answer
How can overseas buyers evaluate a factory remotely?

Combine a structured technical discussion with relevant sample evidence, documents and an agreed remote walkthrough where available. Request views that answer specific process questions rather than an unstructured promotional tour. Remote assessment has limits: it cannot independently verify every operation or future order outcome. Where risk warrants it, consider an appropriately scoped independent review instead of treating a video call as a complete audit.

Link to this answer
What should be confirmed before placing a bulk order with a Chinese supplier?

Confirm the contracting and production responsibilities, approved product reference, quantity allocation, commercial terms, quality requirements and shipping arrangements. Identify who approves changes and who authorizes release after any inspection. Keep a single controlled version of the order documents. Language differences and scattered messages can create ambiguity, so resolve unclear terms explicitly rather than assuming both teams interpret an informal phrase in the same way.

Link to this answer
What sourcing risks should buyers consider?

Consider specification gaps, unapproved substitutions, fit uncertainty, unclear payment or delivery terms, weak traceability and incomplete inspection arrangements. These are project risks to manage, not claims about all suppliers in a country. Prioritize controls according to the garment and order rather than relying on a generic checklist alone. Document remaining uncertainty before commitment and avoid promising your customers outcomes that the evidence does not support.

Link to this answer
Explore related information →

Still Have a Question?

Discuss products, MOQ, sampling and your target market.

Bring your selected styles, measurement requirements and proposed quantity breakdown.

Prepare your enquiry →

START YOUR PROJECT

Tell us what you have in mind.

You can start with as little as a product idea or reference image.

Helpful to prepare: product category, estimated quantity, references, target market, preferred sizes and branding. Not everything needs to be confirmed before your first enquiry.

Catalogue orders from 100+ pcsCustom OEM/ODM projects from 150+ pcsCustom size development available up to 8XL

We use your information only to review and respond to your enquiry. Privacy · Enquiry terms

A production response service must be connected before launch.

Submission is unavailable until the receiving service is connected. Your enquiry has not been sent.